{"id":5711,"date":"2026-10-30T09:27:42","date_gmt":"2026-10-30T12:27:42","guid":{"rendered":"https:\/\/nextage.com.br\/blog\/?p=5711"},"modified":"2026-10-30T09:27:42","modified_gmt":"2026-10-30T12:27:42","slug":"how-to-write-a-software-development-report-a-complete-guide-with-template","status":"publish","type":"post","link":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/","title":{"rendered":"How to write a software development report: a complete guide with template"},"content":{"rendered":"<p dir=\"ltr\">In software projects, the risk that weighs the most is a lack of visibility: the team delivers, but the people paying for it cannot see how much was done, at what quality and at what cost. The development report solves that problem, and it is how a project\u2019s transparency is measured.<\/p>\n<p dir=\"ltr\">A software development report is a periodic document that shows the real state of a project: what was delivered, at what quality, what is at risk and what comes next. It lets the people who pay for the project and the people who make decisions see it through data, not only through meetings.<\/p>\n<p dir=\"ltr\">The term is used in four different contexts: project status (or progress) reports, test reports, bug reports and academic technical reports. This guide covers the first one, the report that managers, directors and technical leads use to follow a software project, including when it is carried out by a partner company. By the end, you will have a template you can copy, a filled-in example and a checklist for reading reports with a critical eye.<\/p>\n<p dir=\"ltr\"><strong>In this guide:<\/strong><\/p>\n<ol dir=\"ltr\">\n<li>What a software development report is<\/li>\n<li>Why the report matters<\/li>\n<li>What a software development report should include<\/li>\n<li>Step by step: how to build the report<\/li>\n<li>Metrics worth tracking (and the ones that mislead)<\/li>\n<li>A ready-to-copy report template<\/li>\n<li>How to read the report of an outsourced project<\/li>\n<li>How often to send the report<\/li>\n<li>Common mistakes<\/li>\n<li>Transparency and documentation in your project: how NextAge works<\/li>\n<li>Frequently asked questions<\/li>\n<\/ol>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5712\" src=\"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-scaled.avif\" alt=\"Professionals in suits review a printed project report with charts and a map, one pointing with a pen while another takes notes in a notebook\" width=\"2560\" height=\"1709\" srcset=\"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-scaled.avif 2560w, https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-300x200.avif 300w, https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-1024x683.avif 1024w, https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-768x513.avif 768w, https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-1-1536x1025.avif 1536w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">What a software development report is<\/h2>\n<p dir=\"ltr\">A software development report gathers, in one to two pages, the situation of a project over a given period: progress against the plan, deliveries, quality, risks and pending decisions. There are different types, and each one answers a different question:<\/p>\n<div dir=\"ltr\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Report type<\/th>\n<th scope=\"col\">Question it answers<\/th>\n<th scope=\"col\">Typical reader<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Status or progress<\/td>\n<td>Is the project on time, on scope and on budget?<\/td>\n<td>Sponsor, executive board<\/td>\n<\/tr>\n<tr>\n<td>Sprint<\/td>\n<td>What was delivered in this cycle and what enters the next one?<\/td>\n<td>Team, product manager<\/td>\n<\/tr>\n<tr>\n<td>Project health<\/td>\n<td>Is the pace sustainable? Are there bottlenecks?<\/td>\n<td>Project manager, technical lead<\/td>\n<\/tr>\n<tr>\n<td>Testing (QA)<\/td>\n<td>What is the quality of what was built?<\/td>\n<td>Technical lead, QA, manager<\/td>\n<\/tr>\n<tr>\n<td>Risk<\/td>\n<td>What could delay or increase the cost of the project?<\/td>\n<td>Sponsor, manager<\/td>\n<\/tr>\n<tr>\n<td>Closure<\/td>\n<td>Did the final result meet what was agreed?<\/td>\n<td>Executive board, client<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p dir=\"ltr\">A similar typology is used by development companies such as <a href=\"https:\/\/www.scnsoft.com\/software-development\/about\/how-we-work\/reporting\" target=\"_blank\" rel=\"noopener\">ScienceSoft<\/a>, which separates process reports (status, health, time tracking, variance, risk, closure) from software quality reports (testing, regression, code review, security). In practice, the status report usually summarizes the others.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">Why the report matters<\/h2>\n<p dir=\"ltr\">Projects that define success criteria from the start, then measure and track results, are more likely to reach them. That is what the Project Management Institute (PMI) points out in its material on <a href=\"https:\/\/www.pmi.org\/blog\/blog-posts\/2025\/05\/29\/20\/38\/reframing-project-success\" target=\"_blank\" rel=\"noopener\">reframing project success<\/a>: defining, measuring and tracking success is one of three factors that help deliver the greatest benefit.<\/p>\n<p dir=\"ltr\">The report is the tool that turns this discipline into routine. Without it, decisions rely on perception, and perception tends to be optimistic. With it, deviations in schedule, scope and quality show up early, when they are still cheap to fix.<\/p>\n<p dir=\"ltr\">There is another reason to pay attention to the topic now. The <a href=\"https:\/\/cloud.google.com\/blog\/products\/ai-machine-learning\/announcing-the-2025-dora-report?e=48754805\" target=\"_blank\" rel=\"noopener\">2025 DORA report from Google Cloud<\/a>, which surveyed nearly 5,000 technology professionals, shows that 90% of them already use AI at work (14 percentage points more than in 2024), but 30% say they have little or no trust in AI-generated code. The study\u2019s central conclusion is that AI amplifies what a team already is: well-organized teams gain efficiency, and struggling teams see their problems grow. With more code being produced faster, the report must also show quality and review, not only delivery volume.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">What a software development report should include<\/h2>\n<p dir=\"ltr\">A good report has nine elements. The golden rule is that each one should serve a decision the reader has to make.<\/p>\n<ol dir=\"ltr\">\n<li><strong>Executive summary and traffic lights.<\/strong> Three to five lines saying how the project is doing, what changed and what needs a decision, with indicators (green, yellow, red) for schedule, scope, quality and budget. Each color needs a written criterion.<\/li>\n<li><strong>Scope and backlog.<\/strong> What was agreed, what was added or removed and how much remains.<\/li>\n<li><strong>Progress against the plan.<\/strong> Planned and completed milestones, with planned date, forecast date and status.<\/li>\n<li><strong>Deliverables for the period.<\/strong> What was completed and validated, with an owner and acceptance status.<\/li>\n<li><strong>Quality.<\/strong> Tests run and passed, defects by severity, code review results and test coverage.<\/li>\n<li><strong>Delivery metrics.<\/strong> A few numbers, with trends: cycle time, velocity, deployment frequency, change failure rate.<\/li>\n<li><strong>Risks and blockers.<\/strong> Risk, impact, probability, owner and action, ordered by severity.<\/li>\n<li><strong>Changes and pending decisions.<\/strong> Change requests with their impact on schedule and cost, and who needs to decide by when.<\/li>\n<li><strong>Next steps.<\/strong> Goal for the next period and expected deliverables, in three to five items.<\/li>\n<\/ol>\n<h2 dir=\"ltr\" aria-level=\"5\">Step by step: how to build the report<\/h2>\n<ol dir=\"ltr\">\n<li><strong>Define the audience and the decisions.<\/strong> An executive wants to know whether the project is on time and on budget; the team wants to know what was completed and what comes next. Write the summary for the first and the details for the second.<\/li>\n<li><strong>Choose a few metrics and a single data source.<\/strong> Pull the numbers from the task board (Jira, Azure DevOps or similar) and from the repository, not from parallel spreadsheets. That way anyone can verify the report.<\/li>\n<li><strong>Set the cadence.<\/strong> A report that goes out whenever there is time is a report nobody reads. Match the rhythm to the project cycle (see section 8).<\/li>\n<li><strong>Write the summary in five lines.<\/strong> If the reader stops there, they should already know what to do.<\/li>\n<li><strong>Give each traffic light an objective criterion.<\/strong> For example: schedule turns yellow when a milestone is forecast to slip by up to five business days, and red above that. Without a criterion, green becomes an opinion.<\/li>\n<li><strong>Review and archive every version.<\/strong> The report history is the project\u2019s memory: it shows when a risk appeared, who decided what and how the scope changed.<\/li>\n<\/ol>\n<h2 dir=\"ltr\" aria-level=\"5\">Metrics worth tracking (and the ones that mislead)<\/h2>\n<p dir=\"ltr\">A good metric is one that supports a decision. The table gathers the most useful ones for agile projects, with the interpretation caveat for each.<\/p>\n<div dir=\"ltr\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Metric<\/th>\n<th scope=\"col\">What it shows<\/th>\n<th scope=\"col\">Decision it supports<\/th>\n<th scope=\"col\">Caveat<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Burndown and burnup<\/td>\n<td>Remaining (or completed) work over the sprint or release<\/td>\n<td>Replanning scope and schedule<\/td>\n<td>Burndown alone hides scope changes; burnup shows them<\/td>\n<\/tr>\n<tr>\n<td>Velocity<\/td>\n<td>How much the team completes per sprint<\/td>\n<td>Forecasting when the backlog will end<\/td>\n<td>Not meant for comparing teams<\/td>\n<\/tr>\n<tr>\n<td>Cycle time<\/td>\n<td>Time from \u201cin progress\u201d to \u201cdone\u201d<\/td>\n<td>Finding bottlenecks in the flow<\/td>\n<td>Prefer median and percentiles to the average<\/td>\n<\/tr>\n<tr>\n<td>Cumulative flow diagram<\/td>\n<td>Where work piles up<\/td>\n<td>Moving capacity to the bottleneck<\/td>\n<td>Requires a well-maintained task board<\/td>\n<\/tr>\n<tr>\n<td>Deployment frequency<\/td>\n<td>How often code reaches production<\/td>\n<td>Assessing cadence and maturity<\/td>\n<td>Do not optimize it in isolation<\/td>\n<\/tr>\n<tr>\n<td>Lead time for changes<\/td>\n<td>Time from commit to production<\/td>\n<td>Measuring process friction<\/td>\n<td>Use the same definition across teams<\/td>\n<\/tr>\n<tr>\n<td>Change failure rate<\/td>\n<td>Share of deployments that cause problems<\/td>\n<td>Balancing speed and stability<\/td>\n<td>Zero percent is not a realistic goal<\/td>\n<\/tr>\n<tr>\n<td>Time to restore service<\/td>\n<td>How long it takes to recover from a failure<\/td>\n<td>Assessing resilience<\/td>\n<td>Depends on good incident records<\/td>\n<\/tr>\n<tr>\n<td>Defects by severity (including escaped defects)<\/td>\n<td>Quality actually delivered<\/td>\n<td>Deciding whether the release goes out or waits<\/td>\n<td>Count defects found after delivery, not only before<\/td>\n<\/tr>\n<tr>\n<td>Test coverage and pass rate<\/td>\n<td>Confidence in regression testing<\/td>\n<td>Assessing the risk of releasing<\/td>\n<td>High coverage does not prove the tests are good<\/td>\n<\/tr>\n<tr>\n<td>Scope, schedule and cost variance<\/td>\n<td>Planned versus actual<\/td>\n<td>Correcting course early<\/td>\n<td>Requires an agreed baseline<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p dir=\"ltr\">The four DORA metrics (deployment frequency, lead time for changes, change failure rate and time to restore service) are explained by <a href=\"https:\/\/datadoghq.com\/knowledge-center\/dora-metrics\" target=\"_blank\" rel=\"noopener\">Datadog<\/a> and by the <a href=\"https:\/\/dora.dev\/dora-report-2025\/\" target=\"_blank\" rel=\"noopener\">DORA program itself<\/a>. The common recommendation is to read them together: improving one at the expense of the others misleads. Raising deployment frequency, for example, can also raise the change failure rate.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">A ready-to-copy report template<\/h2>\n<p dir=\"ltr\">Copy the structure below and adapt it to your project.<\/p>\n<div dir=\"ltr\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">#<\/th>\n<th scope=\"col\">Section<\/th>\n<th scope=\"col\">What to fill in<\/th>\n<th scope=\"col\">Suggested format<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><span dir=\"ltr\">1<\/span><\/td>\n<td>Executive summary and traffic lights<\/td>\n<td>Situation, changes and decisions needed; schedule, scope, quality and budget<\/td>\n<td>Short text with four indicators and a written criterion<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">2<\/span><\/td>\n<td>Scope and backlog<\/td>\n<td>Agreed, added, removed and remaining items<\/td>\n<td>Number of items or points, with variation<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">3<\/span><\/td>\n<td>Progress against the plan<\/td>\n<td>Milestones and percentage completed<\/td>\n<td>Table: milestone, planned date, forecast date, status<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">4<\/span><\/td>\n<td>Deliverables for the period<\/td>\n<td>What was delivered and validated<\/td>\n<td>List: item, owner, acceptance<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">5<\/span><\/td>\n<td>Quality<\/td>\n<td>Tests, defects, code review<\/td>\n<td>Pass rate, open and closed defects, coverage<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">6<\/span><\/td>\n<td>Delivery metrics<\/td>\n<td>Cycle time, velocity, frequency, failures<\/td>\n<td>Three to five numbers with trends<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">7<\/span><\/td>\n<td>Risks and blockers<\/td>\n<td>Risk, impact, probability, owner, action<\/td>\n<td>Short table by severity<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">8<\/span><\/td>\n<td>Changes and pending decisions<\/td>\n<td>Change requests and their impact<\/td>\n<td>Table with decision deadline<\/td>\n<\/tr>\n<tr>\n<td><span dir=\"ltr\">9<\/span><\/td>\n<td>Next steps<\/td>\n<td>Goal and deliverables for the next period<\/td>\n<td>List of three to five items<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p dir=\"ltr\"><strong>Filled-in example (fictional data, for illustration only)<\/strong><\/p>\n<p dir=\"ltr\"><em>Project: Self-service portal | Sprint 7 of 12 | Period: Oct 13 to 26<\/em><\/p>\n<div dir=\"ltr\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Indicator<\/th>\n<th scope=\"col\">Status<\/th>\n<th scope=\"col\">Rationale<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Schedule<\/td>\n<td>Yellow<\/td>\n<td>\u201cPayments\u201d milestone forecast for Nov 6, 3 business days late due to an external API dependency<\/td>\n<\/tr>\n<tr>\n<td>Scope<\/td>\n<td>Green<\/td>\n<td>70 of 120 items completed (58%); 2 new items approved in the sprint, impact absorbed<\/td>\n<\/tr>\n<tr>\n<td>Quality<\/td>\n<td>Green<\/td>\n<td>94% of automated tests passing; no open critical defects; code review on 100% of pull requests<\/td>\n<\/tr>\n<tr>\n<td>Budget<\/td>\n<td>Green<\/td>\n<td>58% spent for 58% progress<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p dir=\"ltr\"><strong>Decision needed:<\/strong> release the payment partner\u2019s staging environment by Oct 30 so the milestone does not move. <strong>Main risk:<\/strong> instability of the external API, with a fallback plan (mock) already implemented.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">How to read the report of an outsourced project<\/h2>\n<p dir=\"ltr\">Companies that hire a development partner need to know how to read the report, not just receive it. Six questions help:<\/p>\n<ol dir=\"ltr\">\n<li><strong>Does green have a criterion?<\/strong> If the traffic light does not come with a written rule, the color is an opinion.<\/li>\n<li><strong>Does quality appear?<\/strong> A report with only activity (hours, tasks) and no tests, defects or code review hides what matters most.<\/li>\n<li><strong>Did the scope change, and is it recorded?<\/strong> An unrecorded change becomes a dispute over schedule and cost later on.<\/li>\n<li><strong>Is the burndown too smooth?<\/strong> A perfect line, sprint after sprint, usually means tasks are too large or the data is only updated at the end.<\/li>\n<li><strong>Are risks listed?<\/strong> A project with no registered risks is rarely a project with no risks.<\/li>\n<li><strong>Can you verify the numbers?<\/strong> The data should come from the task board and the repository, and you should have access to both.<\/li>\n<\/ol>\n<p dir=\"ltr\">At NextAge, clients receive up-to-date reports with progress, code quality and overall project health. The idea is that every decision is based on data, without relying on status meetings to know what is going on. See how <a href=\"https:\/\/nextage.com.br\/en\/services\/software-projects\/\" target=\"_blank\" rel=\"noopener\">software projects with a dedicated IT squad<\/a> work.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">How often to send the report<\/h2>\n<p dir=\"ltr\">In agile projects, the report should go out every sprint, usually every one or two weeks, with a monthly summary for executives and a closure report at the end. The right frequency is the one that allows you to decide in time to correct course.<\/p>\n<div dir=\"ltr\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Report<\/th>\n<th scope=\"col\">Cadence<\/th>\n<th scope=\"col\">Audience<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sprint status<\/td>\n<td>Weekly or biweekly<\/td>\n<td>Team, product manager, sponsor<\/td>\n<\/tr>\n<tr>\n<td>Executive summary<\/td>\n<td>Monthly<\/td>\n<td>Executive board<\/td>\n<\/tr>\n<tr>\n<td>Risks and changes<\/td>\n<td>Whenever there is a relevant change<\/td>\n<td>Sponsor, manager<\/td>\n<\/tr>\n<tr>\n<td>Closure<\/td>\n<td>At the end of the project<\/td>\n<td>Executive board, client<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 dir=\"ltr\" aria-level=\"5\">Common mistakes<\/h2>\n<ul dir=\"ltr\">\n<li><strong>Reports that are too long.<\/strong> Beyond two pages, nobody reads closely. Move the detail to appendices.<\/li>\n<li><strong>Activity only, no results.<\/strong> \u201cWe worked on 40 tasks\u201d does not say whether the project moved forward.<\/li>\n<li><strong>Structural optimism.<\/strong> Everything green until the eve of the delay. Prefer early yellow to a surprise red.<\/li>\n<li><strong>Vanity metrics.<\/strong> Numbers that always go up but support no decision.<\/li>\n<li><strong>No history.<\/strong> Reports that overwrite each other make it impossible to see evolution and follow up on decisions.<\/li>\n<li><strong>No owner.<\/strong> Every report needs someone accountable for the accuracy of its data.<\/li>\n<\/ul>\n<h2>Transparency and documentation in your project: how NextAge works<\/h2>\n<p dir=\"ltr\">A report is only useful if the project behind it is also transparent. In a NextAge project, what is built belongs to the client: source code, technical documentation and report history stay with the company that hired us. The squad works under the client\u2019s management, with deliverables documented sprint by sprint and AI-assisted code review. If someone on the team changes, the project does not stop: replacement of professionals is guaranteed by contract.<\/p>\n<p dir=\"ltr\">NextAge has been operating since 2007 and has delivered more than 600 projects. If you want to understand how this applies to your case, see the <a href=\"https:\/\/nextage.com.br\/en\/services\/software-projects\/\" target=\"_blank\" rel=\"noopener\">software projects<\/a> page.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">Frequently asked questions<\/h2>\n<h3 dir=\"ltr\"><strong>What should a software development report include?<\/strong><\/h3>\n<p dir=\"ltr\">A good report includes an executive summary with traffic lights for schedule, scope, quality and budget; progress against the plan; deliverables for the period; test results and defects; delivery metrics; risks and blockers; scope changes and pending decisions; and next steps. All in one to two pages, so the reader can decide quickly.<\/p>\n<h3 dir=\"ltr\"><strong>How often should you report on a software project?<\/strong><\/h3>\n<p dir=\"ltr\">In agile projects, the report should go out every sprint, usually every one or two weeks, with a monthly summary for executives and a closure report at the end. The right frequency is the one that allows you to decide in time to correct course.<\/p>\n<h3 dir=\"ltr\"><strong>What is the difference between a status report, a progress report and a test report?<\/strong><\/h3>\n<p dir=\"ltr\">A status (or progress) report shows the overall health of the project against the plan: schedule, scope, cost and risks. A test report details software quality: scenarios run, defects by severity and coverage. The status report summarizes quality; the test report provides the evidence behind that summary.<\/p>\n<h3 dir=\"ltr\"><strong>Which metrics should an agile project report include?<\/strong><\/h3>\n<p dir=\"ltr\">Start with a few: burndown or burnup, velocity, cycle time, defects by severity and scope and schedule variance. Mature teams add the four DORA metrics (deployment frequency, lead time for changes, change failure rate and time to restore service), read together. Choose metrics that support a decision for the reader.<\/p>\n<h3 dir=\"ltr\"><strong>Who should write the report and who should read it?<\/strong><\/h3>\n<p dir=\"ltr\">Someone who knows the project from the inside, usually the project manager or technical lead, writes it using data from the repository and the task board. The sponsor, IT and business directors and the team read it. The summary serves executives; the details serve the team and auditors.<\/p>\n<h3 dir=\"ltr\"><strong>How do you track a software project built by an outsourced company?<\/strong><\/h3>\n<p dir=\"ltr\">Require periodic reports with progress, quality and risks, demonstrations of deliverables every sprint, access to the task board and up-to-date documentation. Agree in the contract on what stays with you at the end, such as source code and documentation. At NextAge, clients receive reports and deliverables documented sprint by sprint.<\/p>\n<h2 dir=\"ltr\" aria-level=\"5\">Conclusion<\/h2>\n<p dir=\"ltr\">A software development report is good when it helps people decide: it shows the real state of the project, uses a few metrics with clear criteria, records risks and changes, and stays archived as the project\u2019s memory. Start with the template in section 6, adjust the traffic lights to your context and keep the cadence.<\/p>\n<p dir=\"ltr\">Want a software project with scope, deadlines and reports you can actually read? <a href=\"https:\/\/nextage.com.br\/en\/services\/software-projects\/\" target=\"_blank\" rel=\"noopener\">Talk to NextAge<\/a>. At no cost and with no commitment, you will leave with clarity on what is missing for your project to happen.<\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What should a software development report include?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"A good report includes an executive summary with traffic lights for schedule, scope, quality and budget; progress against the plan; deliverables for the period; test results and defects; delivery metrics; risks and blockers; scope changes and pending decisions; and next steps. All in one to two pages, so the reader can decide quickly.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How often should you report on a software project?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"In agile projects, the report should go out every sprint, usually every one or two weeks, with a monthly summary for executives and a closure report at the end. The right frequency is the one that allows you to decide in time to correct course.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What is the difference between a status report, a progress report and a test report?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"A status (or progress) report shows the overall health of the project against the plan: schedule, scope, cost and risks. A test report details software quality: scenarios run, defects by severity and coverage. The status report summarizes quality; the test report provides the evidence behind that summary.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Which metrics should an agile project report include?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Start with a few: burndown or burnup, velocity, cycle time, defects by severity and scope and schedule variance. Mature teams add the four DORA metrics (deployment frequency, lead time for changes, change failure rate and time to restore service), read together. Choose metrics that support a decision for the reader.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Who should write the report and who should read it?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Someone who knows the project from the inside, usually the project manager or technical lead, writes it using data from the repository and the task board. The sponsor, IT and business directors and the team read it. The summary serves executives; the details serve the team and auditors.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How do you track a software project built by an outsourced company?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Require periodic reports with progress, quality and risks, demonstrations of deliverables every sprint, access to the task board and up-to-date documentation. Agree in the contract on what stays with you at the end, such as source code and documentation. At NextAge, clients receive reports and deliverables documented sprint by sprint.\"\n      }\n    }\n  ]\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In software projects, the risk that weighs the most is a lack of visibility: the team delivers, but the people paying for it cannot see how much was done, at what quality and at what cost. The development report solves that problem, and it is how a project\u2019s transparency is measured. A software development report<\/p>\n","protected":false},"author":5,"featured_media":5708,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[265],"tags":[],"class_list":["post-5711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-planning"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to write a software development report: a complete guide with template - Nextage Blog<\/title>\n<meta name=\"description\" content=\"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to write a software development report: a complete guide with template - Nextage Blog\" \/>\n<meta property=\"og:description\" content=\"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/\" \/>\n<meta property=\"og:site_name\" content=\"Nextage Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T12:27:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1709\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Laura Marques\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Laura Marques\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/\"},\"author\":{\"name\":\"Laura Marques\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#\\\/schema\\\/person\\\/2fdd81129ea968e45b68b610bd9629c0\"},\"headline\":\"How to write a software development report: a complete guide with template\",\"datePublished\":\"2026-10-30T12:27:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/\"},\"wordCount\":2522,\"publisher\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/paperwork-scaled.avif\",\"articleSection\":[\"Planning\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/\",\"name\":\"How to write a software development report: a complete guide with template - Nextage Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/paperwork-scaled.avif\",\"datePublished\":\"2026-10-30T12:27:42+00:00\",\"description\":\"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#primaryimage\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/paperwork-scaled.avif\",\"contentUrl\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/paperwork-scaled.avif\",\"width\":2560,\"height\":1709,\"caption\":\"Profissionais de terno analisam um relat\u00f3rio de projeto impresso, com gr\u00e1ficos e mapa, enquanto um aponta com a caneta e outro faz anota\u00e7\u00f5es em um caderno\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/en\\\/how-to-write-a-software-development-report-a-complete-guide-with-template\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to write a software development report: a complete guide with template\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/\",\"name\":\"Nextage Blog\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#organization\",\"name\":\"Nextage Blog\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/cropped-logo-nextage-completo-scaled-1.webp\",\"contentUrl\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/cropped-logo-nextage-completo-scaled-1.webp\",\"width\":2558,\"height\":556,\"caption\":\"Nextage Blog\"},\"image\":{\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/#\\\/schema\\\/person\\\/2fdd81129ea968e45b68b610bd9629c0\",\"name\":\"Laura Marques\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/cropped-foto-perfil-avatar-96x96.webp\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/cropped-foto-perfil-avatar-96x96.webp\",\"contentUrl\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/cropped-foto-perfil-avatar-96x96.webp\",\"caption\":\"Laura Marques\"},\"description\":\"Graduada em Letras - Portugu\u00eas pela Universidade Tecnol\u00f3gica Federal do Paran\u00e1 (UTFPR), especialista em conte\u00fado para o setor de tecnologia. Escrevo para transformar inova\u00e7\u00e3o em boas hist\u00f3rias e ajudar empresas a alcan\u00e7ar o pr\u00f3ximo n\u00edvel de transforma\u00e7\u00e3o digital.\",\"url\":\"https:\\\/\\\/nextage.com.br\\\/blog\\\/author\\\/laura\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to write a software development report: a complete guide with template - Nextage Blog","description":"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/","og_locale":"pt_BR","og_type":"article","og_title":"How to write a software development report: a complete guide with template - Nextage Blog","og_description":"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.","og_url":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/","og_site_name":"Nextage Blog","article_published_time":"2026-10-30T12:27:42+00:00","og_image":[{"width":2560,"height":1709,"url":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif","type":"image\/jpeg"}],"author":"Laura Marques","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Laura Marques","Est. reading time":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#article","isPartOf":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/"},"author":{"name":"Laura Marques","@id":"https:\/\/nextage.com.br\/blog\/#\/schema\/person\/2fdd81129ea968e45b68b610bd9629c0"},"headline":"How to write a software development report: a complete guide with template","datePublished":"2026-10-30T12:27:42+00:00","mainEntityOfPage":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/"},"wordCount":2522,"publisher":{"@id":"https:\/\/nextage.com.br\/blog\/#organization"},"image":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#primaryimage"},"thumbnailUrl":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif","articleSection":["Planning"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/","url":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/","name":"How to write a software development report: a complete guide with template - Nextage Blog","isPartOf":{"@id":"https:\/\/nextage.com.br\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#primaryimage"},"image":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#primaryimage"},"thumbnailUrl":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif","datePublished":"2026-10-30T12:27:42+00:00","description":"Learn how to write a software development report: what to include, key metrics, how often to send it and a ready-to-use template for your project.","breadcrumb":{"@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#primaryimage","url":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif","contentUrl":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/10\/paperwork-scaled.avif","width":2560,"height":1709,"caption":"Profissionais de terno analisam um relat\u00f3rio de projeto impresso, com gr\u00e1ficos e mapa, enquanto um aponta com a caneta e outro faz anota\u00e7\u00f5es em um caderno"},{"@type":"BreadcrumbList","@id":"https:\/\/nextage.com.br\/blog\/en\/how-to-write-a-software-development-report-a-complete-guide-with-template\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nextage.com.br\/blog\/"},{"@type":"ListItem","position":2,"name":"How to write a software development report: a complete guide with template"}]},{"@type":"WebSite","@id":"https:\/\/nextage.com.br\/blog\/#website","url":"https:\/\/nextage.com.br\/blog\/","name":"Nextage Blog","description":"","publisher":{"@id":"https:\/\/nextage.com.br\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nextage.com.br\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/nextage.com.br\/blog\/#organization","name":"Nextage Blog","url":"https:\/\/nextage.com.br\/blog\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/nextage.com.br\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2025\/01\/cropped-logo-nextage-completo-scaled-1.webp","contentUrl":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2025\/01\/cropped-logo-nextage-completo-scaled-1.webp","width":2558,"height":556,"caption":"Nextage Blog"},"image":{"@id":"https:\/\/nextage.com.br\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/nextage.com.br\/blog\/#\/schema\/person\/2fdd81129ea968e45b68b610bd9629c0","name":"Laura Marques","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/01\/cropped-foto-perfil-avatar-96x96.webp","url":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/01\/cropped-foto-perfil-avatar-96x96.webp","contentUrl":"https:\/\/nextage.com.br\/blog\/wp-content\/uploads\/2026\/01\/cropped-foto-perfil-avatar-96x96.webp","caption":"Laura Marques"},"description":"Graduada em Letras - Portugu\u00eas pela Universidade Tecnol\u00f3gica Federal do Paran\u00e1 (UTFPR), especialista em conte\u00fado para o setor de tecnologia. Escrevo para transformar inova\u00e7\u00e3o em boas hist\u00f3rias e ajudar empresas a alcan\u00e7ar o pr\u00f3ximo n\u00edvel de transforma\u00e7\u00e3o digital.","url":"https:\/\/nextage.com.br\/blog\/author\/laura\/"}]}},"_links":{"self":[{"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/posts\/5711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/comments?post=5711"}],"version-history":[{"count":2,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/posts\/5711\/revisions"}],"predecessor-version":[{"id":5714,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/posts\/5711\/revisions\/5714"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/media\/5708"}],"wp:attachment":[{"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/media?parent=5711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/categories?post=5711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nextage.com.br\/blog\/wp-json\/wp\/v2\/tags?post=5711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}